Project: We were engaged as a mechanical contractor. In addition to the installation of the biogas engine (container version) and its accompanying equipment on the biogas production and preparation system, we designed and delivered a pre-manufactured (SKID version) thermal substation for the distribution of thermal energy.
Investor:
Energana Cerna
Location:
Cerna, Croatia
Project completion:
2021.
Project description:
- Annual tank of solid energy (biomass) with a total volume of ~ 14000 m3 - Fermenter and postfermentor of individual volume ~ 3850 m3 - Final fermentation tank volume ~ 10800 m3 - Biogas engine with a generator of total electrical power 1202 kWel and thermal power 1203 kWth