Project:
Replacement of equipment in the existing old heating plant within the ZAGREB INTERNATIONAL AIRPORT. Mechanical, construction and electrical works in the 15 MW boiler room (the main contractor).

Investor:
Zagreb International Airport

Location:
Velika Gorica / Pleso

End of project:
2019

Types of work:

  • Construction of the new gas boiler room of total capacity 14.4 MW (two 4.2MW boilers and an existing old boiler with a new 6 MW burner)
  • Execution of construction works during reconstruction  
  • Execution of electrical works including automation (boiler room operation and connection to the existing central supervision and management of the Airport)  

Other details:

We disassembled the old equipment in only three months (mechanical equipment, construction equipment, electrical equipment). We installed the new equipment, launched the plant into operation and successfully performed technical inspection.